Towertalk
[Top] [All Lists]

[TowerTalk] Re: [YCCC] Removing and Installing Rohn with a Crane

To: <towertalk@contesting.com>
Subject: [TowerTalk] Re: [YCCC] Removing and Installing Rohn with a Crane
From: km1p@verizon.net (Joe Fitzgerald [jfitzgerald@alum.wpi.edu)
Date: Wed Jun 18 12:26:25 2003
Jim,

Since you will only be lifting a few hundred pounds, a light crane is all
you need ...  the only thing you need is to be sure you have enough "reach".
At WR1X, we put up a 90 foot tower using a 45 ton crane and lifted Rohn 45
three sections at a time.   This beast was BIG and you probably don't want
one on your lawn.

When taking apart the old tower, you should probably have someone blast the
joints with your favorite penetrating oil a day before.  Consider having a
guy on the tower using a hand jack to pull/push the sections apart to avoid
bending Z braces of the tower section.  It is difficult for the crane
operator to know when he is pulling too hard.

Be certain to make sure the sections of the new tower fit together well
before the crane arrives .... they often get bent a bit in shipping, and it
is a lot easier to fix them on the ground than on the tower.

Renting a crane is a great way to go ... so much better than fooling with a
gin pole!

-Joe KM1P

----- Original Message ----- 
From: "Jim Idelson" <k1ir@designet.com>
To: "TowerTalk Post" <towertalk@contesting.com>
Cc: "YCCC" <yccc@yccc.org>
Sent: Wednesday, June 18, 2003 7:23 AM
Subject: [YCCC] Removing and Installing Rohn with a Crane


> Hi all,
>
> I'm upgrading my 25G tower to 45G. If I can get all the hardware ready,
this
> looks like the perfect job to make efficient use of a crane. I'm
considering
> the possibility of assembling the 45G on the ground, lowering the 25G and
> raising the 45G in one short crane visit. The towers are 85 feet and guyed
at
> three levels. The base is a pier pin. I would plan to move the mast and
the
> existing guy wires from the old tower to the new tower as soon as the old
tower> I'm looking for specific instructions on what crane to rent, and how
I should
> instruct the rigger to take the 25G down and how to put up the 45G without
> damaging/buckling either tower.
>
> 1.  Should these operations be done in a single lift or more?
> 2.  Where and how should the rigger attach to the tower?
> 3.  What should be done differently for the 25G versus the 45G?
>
> Thanks for your thoughts.
>
> Jim Idelson K1IR
> email    k1ir@designet.com
> web    http://www.designet.com/k1ir
>
>
> PS From the responses to my recent post about installing a ring rotor, I
sure
> hope to have the ring installed and operating properly on the top section
> before the tower is lifted.
> _______________________________________________
> YCCC mailing list
> YCCC@yccc.org
> http://lists.contesting.com/mailman/listinfo/yccc
>

<Prev in Thread] Current Thread [Next in Thread>