[TowerTalk] Plumbing a Tower

To: <towertalk@contesting.com>
Subject: [TowerTalk] Plumbing a Tower
From: "Dale Martin" <kg5u@hal-pc.org>
Date: Tue, 28 Nov 2006 10:19:43 -0600
List-post: <mailto:towertalk@contesting.com>

I played around on the other day doing some mainteance.  I made up a little
jig out of string to suspend between the three legs of my Rohn 25G.  I
looped and loosely tied one string to one leg.  I tied the other end of the
string to the horizontal brace directly across from that leg and halfway
between the two other legs.  I did the same for the other two legs and
strings.  The point at which the strings all crossed each other is supposed
to be the center of the tower...right? 

I may have done this all wrong.  I read N4KG/K7LXC's comments about plumbing
a tower.  I just used a deep 1/2" socket as my weight and nylon twine as the
line.  Way too light compared to N4KG's #20 wire and 5 lb. window sash
weight.  I haven't yet found a day since hanging the line where the wind is
light enough to even let the string hang anywhere near the center even 20'
down from where it's hung.  

I also think maybe I should do the plumb thing in stages -- in my case, my
tower is 70' and I have two sets of guys.  Should I plumb from the lower set
of guys to get that portion of the tower plumb, then plumb from the upper
set of guys to the lower set?   The plumb line would be shorter and maybe
less influenced by any wind.  

Has anyone tried a laser?  Seems like it would be easy to make up a laser
target jig to place through the tower, then, on the ground, use a laser in
the center of the tower and aligned to the vertical.  Anyone done that? 

Comments?  Suggestions?  

73,
Dale, kg5u


 


_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>