Towertalk
[Top] [All Lists]

Re: [TowerTalk] Mast install help

To: towertalk@contesting.com
Subject: Re: [TowerTalk] Mast install help
From: Michael Tope <W4EF@dellroy.com>
Date: Mon, 24 Jan 2022 11:41:08 -0800
List-post: <mailto:towertalk@contesting.com>
In the past I've used a piece 20ft piece of 1.5 inch schedule 80 aluminum pipe (1.9 inch O.D. / 1.5 inch I.D.) with a 12ft piece of 1.5 inch O.D. aluminum tubing (I believe it was 0.25" wall) inserted into the bottom 12 ft of the 20ft pipe to reinforce it. I used that pipe/tube assembly with a WB0W gin pole pulley and clamp to install a 24 ft x 0.25in wall chrome-moly mast in a Rohn 25 tower. The extra length from the 20ft long water pipe allows you to grab the mast above its center of gravity and still clear the top of the tower.

73, Mike W4EF...............

On 1/24/2022 6:55 AM, gc wrote:
I've a 22ft chromoly mast and am wondering if I will get this installed at
the moment (without a crane).

Right now, I have 40ft of R55, and I thought I would raise the mast and
drop it into the yet to be completed tower (easier to do in my mind) vs
trying to stab it into the bearing when the tower is completed.

How have others dealt with a 22ft mast, when you have a 12ft gin
pole.......what am I missing to get this done?

Greg
N5IF

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>