[Amps] Serious design stage

R.Measures r at somis.org
Fri Apr 23 03:55:04 EDT 2004


On Apr 23, 2004, at 12:01 AM, peter.chadwick at Zarlink.Com wrote:

>
>
>
>
> Rich said:
>
>> but the li'l brother can be run easily on SSB from 1-phase 240v
>
> I thought these days that Pacific G & E (I'm told that's 'Pacific=20
> Graft and
> Extrortion!') was charging so much for electricity that very few could
> afford to run a 'California kilowatt' any more.

=F0  The post energy crisis (manufactured by Reliant and others)  rates=20=

in CA are astronomical when one uses above the first level in rates. =20
Our electric bills run about $38 per month after we converted to high=20
efficiency appliances and lights.  Photo-voltaic is cheap enough now=20
that high rate level users can eventually pay back the cost.
-  cheers, Peter

>
> 73
>
> Peter G3RZP
>
>
>
Rich Measures, AG6K, 805.386.3734.  www.somis.org



More information about the Amps mailing list