[Mldxcc] 3Y0X Update

Ken K6TA k6db at volcano.net
Thu Feb 9 11:06:20 EST 2006


The 15 Meter op reports that the WX conditions are 1C, 100 ft visibility, 12
inches on new wet snow.  Two of the stations are still on the ship waiting
for the fog to lift.

For some interesting info on the first Peter I operation in 1987 see:

http://8.3.8.118/peterone/1987.htm





More information about the Mldxcc mailing list