[RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI

Mike NA6MB na6mb.mike at gmail.com
Wed May 16 18:55:33 EDT 2018


There is a good QST article here:


      APR 2016 -/QST/(PG. 33)

      Can Home Solar Power and Ham Radio Coexist?
      (Feature)

*Author:*Brock-Fisher, Tony, K1KP




and here:
http://rsgb.org/main/files/2014/02/QST20Solar20April2020165b25d.pdf

He does not name the manufacturer, only the installer.

We have a local ham KQ6RS Randy who has had several of these installed 
in is neighborhood.
Randy is a retired Qualcomm antenna engineer and has lots of experience 
and test gear to find and characterize the interference.
The company (manufacturer of the system) causing most interference 
locally is Solar Edge (SE).
Several local installers have installed noisy SE systems.
Randy has given several talks about his problem and solutions.
He has worked with SE to explain why it is interfering.

There is a new system about to be released "soon".
That does not solve the currently installed systems nor the systems 
installers have in stock ready to install.

The problem, as stated in the article, is that they use boosters on each 
panel and configure the wiring in a loop.

The company has been cooperative by directing the installers to install 
toroids and change the wiring to NOT make a loop.
This helps a great deal.
For some reason (expense I suppose) they don't want to change the 
recommended installation method.
They have fixed several locally but have recently complained about Randy 
giving his talk and "drumming up complaints".

ARRL RFI office has also helped.

73,
Mike NA6MB



On 5/16/2018 3:09 AM, David Robbins wrote:
> He's 'done many in the past'????  then he should be able to supply a couple
> references that you can check with!
>
> David Robbins K1TTT
> e-mail: mailto:k1ttt at arrl.net
> web: http://wiki.k1ttt.net
> AR-Cluster node: 145.69MHz or telnet://k1ttt.net:7373
>
>
> -----Original Message-----
> From: RFI [mailto:rfi-bounces at contesting.com] On Behalf Of Tony
> Sent: Wednesday, May 16, 2018 01:07
> To: rfi at contesting.com
> Subject: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI
>
> All:
>
> Solar Edge, the manufacturer of solar panel systems, has informed me that
> they will be installing RFI suppression on a neighbors installation to stop
> the RFI affecting my station. The job will take place on May 29th, weather
> permitting.
>
> The companies field engineer assured me that the fix will work as he's done
> many in the past. My neighbor has given me permission to access his home so
> I can monitor the process. I'll share what information I gather with the
> group once the job is done.
>
> For those who may be having similar issues with Solar Edge systems, contact
> Tefford Reed at: Tefford.Reed at solaredge.com or Tom Simpson at:
> Tom.Simpson at solaredge.com
>
> I filed a complaint with Solar Edge in August of 2016 so this fix has been a
> long time coming.
>
> Tony -K2MO
>
> _______________________________________________
> RFI mailing list
> RFI at contesting.com
> http://lists.contesting.com/mailman/listinfo/rfi
>
> _______________________________________________
> RFI mailing list
> RFI at contesting.com
> http://lists.contesting.com/mailman/listinfo/rfi

-- 
Thanks,
Mike
NA6MB



More information about the RFI mailing list