Hello all...took a few days off from tower building to attend the company
Christmas part in Hilton Head, SC.....yesterday (Monday) I build up guy
wires for the next level on the 20m tower...we added 3 more sections so
total height is now 110 ft...today the guys will go up and put the ring
rotor at the 105 ft level...the stacks for 20m will be at 52ft, 105 ft and
155 ft....still need to get the last tower at the old qth down...the 40m
telrex is there and a 5 el 20m that will be part of the stack....its
starting to look like I will still not have enough in the air for arrl
cw.....i still need help in shack...grounding, wiring up cat5 cables,
networking, etc....anybody willing?? need help installing beverages too...I
am still doing all the tower work, but I could use some assistance....Happy
Holidays to all...de Rick