[TenTec] 60M
Bwana Bob
wb2vuf at qsl.net
Fri May 16 10:24:51 EDT 2003
Can we operate portable? If one of the purposes of the new allocation is
emergency comms, there ought to be some flexibility as to location. I
wonder if contests of Field Day will be allowed. With only 5 channels
maybe all we could do would be to establish 4 regional disaster nets
plus one calling frequency.
Bob WB2VUF
"Dr. Gerald N. Johnson, electrical engineer" wrote:
>
> Can't work mobile, the rules for 60m prohibit mobile operation. What
> I've seen so far doesn't give a tolerance on the frequency or specify
> how to accurately measure the frequency of a suppressed carrier. I know
> the federal licensees are supposed to meet 20 ppm but that's a whole lot
> harder to measure for SSB than to write down in a rule book.
>
> 73, Jerry, K0CQ
>
> --
> Entire content copyright Dr. Gerald N. Johnson, electrical engineer.
> Reproduction by permission only.
> _______________________________________________
> TenTec mailing list
> TenTec at contesting.com
> http://lists.contesting.com/mailman/listinfo/tentec
More information about the TenTec
mailing list