Topband: Mounting feed wire inside the tower on a shunt feed.
Herb Schoenbohm
herbs@islands.vi
Mon, 20 Dec 1999 16:40:13 -0400
N4UK wrote:
I'd be very
>> interested to find out if running the wire inside the tower will detract
>> from the overall system performance.
Ken, I do remember constantly blowing out the dial lamps in my rotor control
box until I bypassed the leads to ground at the based of the tower. A better to
solve that problem might be to make a choke coil with excess rotor cable at the
tower base.
Herb (KV4FZ)
--
FAQ on WWW: http://www.contesting.com/topband.html
Submissions: topband@contesting.com
Administrative requests: topband-REQUEST@contesting.com
Problems: owner-topband@contesting.com