Topband: grounding for Beverages

Dave NØRQ (lists) n0rq-lists at sbcglobal.net
Mon Nov 1 18:14:45 EST 2004


For a standard, single-wire terminated Beverage, I read recently
(either here or TowerTalk) about using 2  4-5' ground rods, but
I didn't understand if that was at the feedpoint or at the 
termination end of the wire.
http://www.w8ji.com/beverages.htm mentions this as well,
and if I'm understanding right, Tom means 2 ground rods
at the termination point (?).  Right now, I have a 4' rod
(8-footer cut in half) at each end, but wanted to improve
it a bit, and I'd just as soon improve the correct end. ;-)
Thanks!
-- 
Dave NØRQ


 


More information about the Topband mailing list