Topband: Ladder line Beverage Installation

MU 4CX250B 4cx250b at miamioh.edu
Thu Apr 13 14:21:30 EDT 2017


I used porcelain insulators with a lag screw on one end and screwed
them into the opposing sides of the 4x4 support posts. I threaded the
wd1a through the large hole in the insulators,  and adjusted the
tension at the end post. Very easy, and trouble-free.
Jim w8zr
Sent from my iPhone

> On Apr 13, 2017, at 7:58 AM, Rob Atkinson <ranchorobbo at gmail.com> wrote:
>
> Why don't you nail or screw a cross piece of needed length to the top
> of each post, and screw a threaded porcelain standoff insulator so it
> sticks up on each end.  You can find them at hamfests.  They are
> usually white porcelain cylinders with tapped holes on each end.
> Since it is only for receiving there might be an even easier hardware
> fix.   You could probably transmit with my construction.
>
> Rob
> K5UJ
> _________________
> Topband Reflector Archives - http://www.contesting.com/_topband


More information about the Topband mailing list