[TowerTalk] SSV wind design certification

Bob Bergman bbergman@frii.com
Wed, 28 May 1997 14:23:14 -0600


I picked up my permit today for a gigantic 40ft SSV tower.  What a
hassle for such a simple installation!

On the permit, the review engineer wrote " Provide wind design
certification for Inspector on-site. (80 mph, exposure 'C' minimum)"

Does anyone have Rohn's Drawing C-870699 that I could borrow for a
while????  This is Rohn's standard 90mph SSV certification that I think
I could use to satisfy the inspector.

Thanks and 73's

Bob  --  K0FR

--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:			  http://www.contesting.com/km9p/search.htm