[TowerTalk] Slump testing?

J.P. Kleinhaus w2xx@cloud9.net
Tue, 07 Apr 1998 12:01:44 -0400


Greetings:

I am scheduled to pour concrete for my (long awaited) tower
project on Friday.  I ordered 5000 PSI mix, but realize that
short of performing a slump test on site, I have no way of knowing
if the stuff being delivered will be up to spec.

Any hints on doing this?  Has anyone actually done this before,
or should I assume that since I ordered 500 PSI, I should end
up with at least 4000 PSI ? :-)

73, J.P. W2XX
-- 
======================================================================
J.P. Kleinhaus, W2XX  (fdba AA2DU)
E-mail:  w2xx@cloud9.net

As we say in the software business:  "You are hosed."  
======================================================================


--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search