[TowerTalk] erection
MarchandJohn
jmarchand@ecrm.com
7 Jan 1998 07:48:54 -0400
Hi Bruce,
You could always get 3 of those small, cheap "bullet" levels, tape one to
each leg of the tower section.
Pound a stake in the ground about 10' out from each leg of the tower.
Attach a rope from each tower leg (about 6' up), then around the appropriate stake and back to the tower where it can be tied off.
Level by adjusting the rope end from each stake and watch the levels....
Really simple, but I've seen it work well.
73
John K1RC
35 MI NW OF BOSTON
PS, Dont stand on the tower base for long periods of time while the
concrete is drying.......
_______________________________________________________________________________
From: Bruce Makas on Tue, Jan 6, 1998 6:56 PM
Subject: [TowerTalk] erection
To: towertalk@contesting.com
Does anyone have any simple trick they use to keep the first tower section
vertical when the concrete is poured. I will put a form around the top of
the hole so that the top of the concrete will be above the ground and I can
crown the surface for water run-off but when I try and think of a simple
way to brace the bottom section, I go brain dead. Any ideas?
73, Bruce Makas, K1MY
Cape Elizabeth, Maine
207/767-8150
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search