> s there any reason why a person should use a Rohn 5' base section to bury
>  in concrete versus using a standard 10' section buried in concrete? As far
>  as I can tell from my Rohn catalog there's no physical difference in the 
two
>  except for length. Does anyone know of a difference? My reasoning was that
>  if I used a 10' section instead, I would have about 6' of known straight 
leg
>  to work with in tweaking it to perfectly vertical, versus having to bolt on
>  a piece on top of the base section to work with, and dealing with the
>  inherent uncertainties of the bolted joint, verticalness-wise.

    It's 5 of one and 10 of another. If you use a 5-footer, you wind up with 
all complete 10 foot sections when it's time to remove the tower. If you use 
a 10-footer in the concrete, you've got to chop it off and you wind up with a 
tower 5 feet lower next time you put it up. 

    Don't forget to put 4-6" of gravel in the bottom of the hole and set the 
section directly on the gravel so the legs will drain of water condensation.

Cheers,    Steve    K7LXC
Tower Talk 

List Sponsor: Are you thinking about installing a tower this summer? Call us
for information on our fabulous Trylon Titan self-supporting towers - up to
96-feet for less than $2000! at 888-833-3104 <A HREF="http://www.ChampionRadio.com">
www.ChampionRadio.com</A>

-----
FAQ on WWW:               http://www.contesting.com/FAQ/towertalk
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com