[TowerTalk] Concrete from on-site materials
   
    Bill Coleman
     
    aa4lr@arrl.net
       
    Tue, 5 Mar 2002 14:32:45 -0500
    
    
  
On 3/5/02 12:43 AM, Hisashi T Fujinaka at htodd@twofifty.com wrote:
>I'd suggest premix and a pump.
For the amount of concrete (.7 Yards) and all the minimum fees, it worked 
out to be a LOT cheaper to mix it myself.
If I were pouring a base and three guy points, Ready-Mix might have been 
a better option.
Bill Coleman, AA4LR, PP-ASEL        Mail: aa4lr@arrl.net
Quote: "Not within a thousand years will man ever fly!"
            -- Wilbur Wright, 1901