[TowerTalk] Leveling a Trylon Base?

Rich Hallman - N7TR rich at n7tr.com
Sun Oct 26 07:18:05 EST 2003


Since there is a 3 Inch taper to the section (8 ft)...I was going to add
a 1.5 inch block to the end of a 4 ft level to compensate for the
taper....

Has this been done in the past?

Thanks...
Rich

-----Original Message-----
From: Dave N0RQ [mailto:n0rq-1 at dfwair.net] 
Sent: Sunday, October 26, 2003 1:15 AM
To: Rich Hallman - N7TR
Cc: towertalk at contesting.com
Subject: Re: [TowerTalk] Leveling a Trylon Base?


I could never quite figure a good way to plumb-bob the thing, though I'm
sure it could be done.

For mine, I used a good 4' level, held it across the 3 faces (one at a
time, of course ;-), resting on the bolts, and adjusted with thin steel
or aluminum plates under the legs as needed.


Dave N0RQ

----- Original Message ----- 
From: "Rich Hallman - N7TR" <rich at n7tr.com>
To: "Tower Talk" <TOWERTALK at contesting.com>
Sent: Saturday, October 25, 2003 6:48 PM
Subject: [TowerTalk] Leveling a Trylon Base?


Almost ready to pour bases for two T-400 80 Ft Trylons....

What is the best way to level the base section since the legs taper
inwards?

Thanks...
Rich

N7TR Web Site - Updated 20 Oct
www.n7tr.com <http://www.n7tr.com>

N7TR DX-Cluster
 <telnet://dxc.n7tr.com>


_______________________________________________

See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless
Weather Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with
any questions and ask for Sherman, W2FLA.

_______________________________________________
TowerTalk mailing list
TowerTalk at contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk



More information about the TowerTalk mailing list