[BULK] - Re: [TowerTalk] Tower Installation

Steve Katz stevek at jmr.com
Thu Nov 18 16:56:55 EST 2004




> Here is an even better way to handle the lines:
> 
> Throw away all the factory standoffs.
> Attach a piece of angle iron to the top section, just
> below the very top.
> Attach a Kellum Grip (see below) on the end of the
> angle iron, and let the cables dangle from it, all the
> way to the ground. Put a large trash barrel on the
> ground, and guide all the cables into it as the tower
> comes down.
> 
> 
> ::That works well in places where it never freezes.  In places where it
> freezes, Murphy dictates that the barrel will be full of coax, then it
> will snow or rain, then it will freeze, and without a great deal of work
> you'll never get the tower cranked back up until the next
> thaw....-WB2WIK/6
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 


More information about the TowerTalk mailing list