[TowerTalk] Guying free-standing towers
Chris Pedder
chris at g3vbl.co.uk
Mon Apr 11 08:37:14 EDT 2005
At 13:54 11/04/2005, n2ea wrote:
>Let's be clear, however: Tensioned guys add load to a tower.
>Therefore, the tower will reach its material failure point
>sooner.
I beg to differ. The function of sensible guying is to prevent the tower
from reaching its material failure point, or at least delay it.
>The function of the guys, is NOT to add strength to the
>system. The function is to force a different failure mode,
>and the price of doing that will be reduced load rating, or
>earlier failure,
on the contrary, the function of guys IS to make the system stronger. After
all, you do guy Rohn 25/45/55 don't you? Sensible guying here, and
elsewhere, will increase the load rating and produce later failure.
Chris