Thanks for the input. I had forgotten about bringing the coax, ground, rotator control, remote coax switch control, and of course 240 VAC for the Alpha in the room. Taking all of that into consideration, the basement looks better as I do not have to worry about "restoring to original" if I sell the house. 

I will pour the tower base this week and will use 5 ground rods (3 at the tower and 2 at the entrance). I already have Polyphaser goodies to assist in grounding. All that remains is to get an OR-2800 rotator to turn the stack and a thrust bearing. Oh well, since the concrete will take 28 days to cure, I have plenty of time to accomplish all of the foregoing.

Again, thanks for your helpful input.

73,

Tommy - K6YE