[TowerTalk] Next step in installing tower: underground power

chris chris at fite.com
Sun Jan 9 19:20:34 EST 2005


Now that I have the excavation for the base completed, the next step is 
underway.  I am digging the trench to have my electric service drop put 
underground.  This will prevent anything that may fall from the tower 
from falling into the power lines.

Although the trench is not very wide, the 30 inches of required depth 
makes for a lot of work to dig.  I consider this to be another cost of 
erecting a tower.
-- 
Chris, K4AY

In theory, theory and practice are the same.  In practice, they are 
different.