[TowerTalk] Assembled tower; lifting by Crane
    Pat Barthelow 
    aa6eg at hotmail.com
       
    Tue Mar 15 21:18:32 EST 2005
    
    
  
Tom Said:
>We used sign trucks all the time in Ohio to install
>CATV/MATV headend towers. We'd assemble the entire antenna
>system on the ground and pick it up with a sign (boom)
>truck.
When you pick up an assembled tower, say a Rohn 25, 45, 55 family,  say 80 
ft or so, do you need to implement a multi-attachment scheme, or can you 
lift from a single point, without damaging the tower.  Or said another way, 
how long of a Rohn 25 tower can you lift, assembled:
1.  from a mid point?
2. From one the top, with the base on the ground?
tnx, 73,
de Pat  aa6eg at hotmail.com
    
    
More information about the TowerTalk
mailing list