[TowerTalk] Ground strap to water pipe?
Martin, AA6E
martin.ewing at gmail.com
Sun May 8 15:29:53 EDT 2005
Wisdom, please: I want to run 1.5 inch copper strap from my SPG
bulkhead to my AC ground point, which is my water service entrance,
following the "bond the grounds together" principle.
Question is what is the best way to transition from the copper strap
to the water pipe, which is maybe 1.5 or 2 inches in diameter? (Don't
know for sure because it's really hard to access in my crawlspace.)
I don't find any commercial products for this scenario. I could rig
something with U bolts or radiator clamps, but what is the group think
here? Is there a problem with copper to steel contacts? Do we
believe in special ointments like "kopper shield"? Etc.
Thanks for your attention.
73 Martin AA6E
--
martin.ewing at gmail.com
http://blog.aa6e.net
More information about the TowerTalk
mailing list