[TowerTalk] 80m 4-square materials

Bob Maser bmaser at tampabay.rr.com
Sun Dec 17 20:40:17 EST 2006


With all due respects, that is B.S.  When I finally took my 63 ft verticals 
down, I untied the last remaining guys, the ones that were at the 35' level 
and jumped back thinking they would come crashing down.  To my surprise, 
they stayed up.  Since I was not going to take the tubing with me, I grabbed 
one of the top guys and pulled.  The damn things didn't buckle until the 
tips were close to the ground.  Maybe this was because I had sleeved them 
internally with some steel conduit for the first 6 feet. True story.

Bob W6TR
----- Original Message ----- 
From: "Richard (Rick) Karlquist" <richard at karlquist.com>
To: "Bob Maser" <bmaser at tampabay.rr.com>; <donovanf at starpower.net>; 
<TOWERTALK at contesting.com>
Sent: Sunday, December 17, 2006 8:25 PM
Subject: RE: [TowerTalk] 80m 4-square materials


>s
>> but if I put up another 4 square with 3" irr. tubing I will only
>> guy them at
>> the 35 foot level because I removed the top guys about 6 months before I
>> actually took the array down and  I had no problems, even with
>> some strong
>> Santa Ana winds.  That tubing is strong stuff.
>
>
> I know that at my QTH, about once a year, we get bad enough winds
> to buckle 30 ft of unguyed 3" irrigation tubing.  YMMV.
>
> Rick N6RK 



More information about the TowerTalk mailing list