[TowerTalk] concrete forms
Cqtestk4xs at aol.com
Cqtestk4xs at aol.com
Mon Jul 31 12:51:13 EDT 2006
28 days allows concrete to cure to around 90% of its strength.
If allowed to dry to quickly, the surface becomes "crazed" and can develop
lots of small surface cracks. This is not usually a problem with tower
installations since there is very little surface area with respect to the amount of
concrete in hole.
I have poured quite a few bases in the hot Florida sun and have never had
one develop any cracks, even though I took no special measures to keep in wet.
My belief it is a non-issue.
I would however wait several weeks before erecting any tower after pouring
the base. Your choice.
Bill K4XS