Ok, Hypothedical situation. Ham Station A is going to install a T500 40Ft Trylon tower, Thats 1150 plus 625 shipping. Assuming 200 bucks for 1 day digging with a rented back hoe for the hole. How does one estitmate total cost from there. Im swimming in numbers. BTW Local Concrete is 75 a yard and 85 with fibre.