Norm, it's spooky. I just got back from the radio room to check the email
after working a little early morning DX on 40M CW.  I'm reading your post
about Suke and scratching my head. I just worked the guy.  He really had a
very strong signal this morning into Dallas on 40. Its interesting to see
his tower setup.  Real impressive.  Thanks for sharing.  73 Saad N5FF 
-----Original Message-----
From: towertalk-bounces at contesting.com
[mailto:towertalk-bounces at contesting.com] On Behalf Of NPAlex at aol.com
Sent: Sunday, October 08, 2006 6:25 AM
To: towertalk at contesting.com
Subject: [TowerTalk] Tower Base JA style
Lately there has been discussion of tower  bases and installations as in 
Greg's message below, and I am also in the process of relocating a tower
with the 
attendant problems of digging the hole, stabilizing the hole (sandy soil), 
rebar framing and finally pouring the concrete.   
I thought that was a lot of work and expense until I ran across the
following 
series of pictures of a Japenese ham's tower installation.  Suke JM7OLW must
have one of the most expensive tower support systems ever constructed.  Take
a 
look at his site - http://www.geocities.jp/jm7olw_suke/KT35SR.html  Albeit
it 
is a big tower, that is a lot of concrete work.  He also has an outstanding 
signal on 40m CW most mornings.
Regards,
Norm W4QN
===============================================
 
Message: 8
Date: Sat, 7 Oct 2006 17:19:48 -0700
From: "AB7R" <ab7r at cablespeed.com>
Subject: [TowerTalk] Tower base advise
To: <towertalk at contesting.com>
Message-ID: <NPEPLDGLIFKDGPHGAGOMMEHJEOAA.ab7r at cablespeed.com>
Content-Type: text/plain;    charset="iso-8859-1"
Not sure if I over did this or not.  My neighbor brought his backhoe over
this afternoon to dig the foundation for my HG-70HD tower and raising
fixture.
The specs only call for a 4x4x8 hole.  While we did not quite hit 8ft (a bit
over 7 in the middle), the dimensions came to 6.5 x 6.5.  Thats 270 cubic ft
vice 128.  Is the slightly shallower depth going to make a big difference?
I attached a couple pics.
I hope to schedule the concrete pour for this week.  4000 psi and gonna have
it poured pretty wet.  Do I need to get one of those vibrating things or is
pouring it wet sufficient?
Thanks
Greg
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk at contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
    
    
More information about the TowerTalk
mailing list