[TowerTalk] Crane use for tower install

K7LXC at aol.com K7LXC at aol.com
Sat Aug 11 08:41:44 EDT 2007


 
In a message dated 8/10/2007 7:53:29 P.M. Pacific Daylight Time,  
towertalk-request at contesting.com writes:

>  Thank you all for the advice.  Seem like most believe  doing in "smaller
bites"  is the way to go.   Since the  first set of guys are at 31' and the
second are at 61', top at 94' . I am  now think of lifting the first 7
sections (70ft)  thereby permitting 2  guy levels to be anchored before
raising the last 30ft of the Rohn  45g.


    Why make 2 lifts when you can make 1?  

>  The negative seems to be more crane time and not being able  to run the 
coax
on the tower before the lift.
 
    That's NO negative. See, you're already trying to  violate my admonition 
to only do one thing at a time. You do the cables later.  

>  I am still likely to have the rotor and mast in the 30ft  lift.
 
    Sure. If you put the whole tower up at once, you  still have to bring the 
mast up so either way you've got 2 lifts. Six of one,  half-dozen of the 
other.
 
Cheers,
Steve     K7LXC