[TowerTalk] permit in hand
    Jim Brown 
    jim at audiosystemsgroup.com
       
    Fri Aug 31 23:53:56 EDT 2007
    
    
  
On Fri, 31 Aug 2007 18:26:30 -0500, bill rubin wrote:
>The point I am making here is not the cost. Its that government is out of
>control. 
Far from it. Indeed, exactly the opposite. The building department quite 
properly required that you provide engineered drawings showing that what you 
proposed to install was safe. They would be out of control if they FAILED to 
do that. And you DID get a deal. I've been a (sound system) design 
consultant for 20 years. My current bill-out is $150/hr, and I won't sign 
anything I haven't checked myself. I'm NOT a PE, but I am a professional. :) 
73, 
Jim Brown K9YC
    
    
More information about the TowerTalk
mailing list