Hi Pat,

You need to do what's called a slump test when the mix is delivered.  To be 100%
sure, you need to pour a cylinder of the mix you used and then have it tested
(crushed) after 30 days to determine the psi of the mix actually in the ground.

J.P.

Quoting Pat Masterson <bat at grumman.com>:

> If I order 3500 LB concrete from the supplier, how do I know that when
> the truckload arrives, it doesn't contain a weaker mix? What are the
> tests that can be performed before the stuff is poured into the hole?
> Should I hire  a professional inspecter to do the tests? -pat
> 
> *-----------------------------------------------------------------------------*
> *  Pat Masterson  V01-01,  Northrop Grumman,     *  Ham:KE2LJ
> *  1 Grumman Road West                           *  President Grumman
> Amateur
> *  Bethpage, NY 11714                            *  Radio Club  WA2LQO
> *  email: bat at grumman.com   Fone: 516-346-7125   *  www.qsl.net/wa2lqo
> *-----------------------------------------------------------------------------*
> _______________________________________________
> 
> 
> 
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
> 





More information about the TowerTalk mailing list