[TowerTalk] falling derrick for Universal Tower raising

JoeCoolDXer JoeCoolDXer at msn.com
Tue Oct 16 11:17:46 EDT 2007


The worst-case structural loads on one of these arrangements can occur when the tower is being lowered.  You can get what engineers call a "suddenly-applied load" which can be as much as twice the static load associated with merely the weight and distribution of the system components.

Buddy of mine had a setup like that, 70' aluminum self supporting tower with one tribander, and no appreciable extending mast.  His lowering technique was to attach  the winch cable and a rope at a point 2/3, or so, up the tower, remove the third bolt in the base (permitting tilt pivot on the other two), back off a slight bit of slack in the winch cable, and send his assistant (me) out to pull on the rope to get it started tilting.

Well, one day he provided a bit excessive slack in the winch cable and when I pulled on the rope, I observed the tower didn't immediately stop and I quickly dove for cover out of the line of fire.  When I looked up, the tower was arrested at an angle of 50-60 degrees from the horizontal, and was oscillating about the winch cable connection point, with an amplitude of a couple of feet in the middle of the unsupported length, and at the top :  Boing-oing-oing-oing.   Big-time loads on the system, but fortunately it all held together with no damage.  Buddy was LHFAO.

  ----- Original Message ----- 
  From: Chuck Gerarden<mailto:cgerarden at atomix.com> 
  To: towertalk at contesting.com<mailto:towertalk at contesting.com> 
  Sent: Tuesday, October 16, 2007 7:12 AM
  Subject: [TowerTalk] falling derrick for Universal Tower raising


  I recently bought and installed a 70' aluminum Universal tower to hold a 
  XM-240 40 meter beam. If you look at the installation drawings you see a 
  man walking up the tower. My contractor laughed pretty good at that 
  illustration, as did I. I decided to use the falling derrick method of 
  raising the tower. I bought a Rohn 25G tiltover base plate and 3 10' 
  sections of 25G for the derrick. I mounted the plate on the same 
  platform as the tower. I plan to use the winch on my 700lb ATV to pull 
  the derrick down and the tower up.

  I have not done any calculations, as it is easier to ask you experts and 
  civil engineers on this reflector. If  nobody has the answers I will 
  crack open the right books and figure it out. It looks like rather 
  simple math based on  weight of the tower, beam weight, rotor weight, 
  mast, overhang past  attachment point. Here are the facts.

  70 foot alum. Universal tower HD21-70     322lbs
  30' rohn 25 as derrick.
  XM-240 beam 55lbs - mounted just above tower tube, little extension 
  beyond tower top
  6' alum mast 5lbs
  DX1000 Yaesu rotor 10 lbs, mounted 3 feet down in top section
  steel line from 30' point on derrick to 40' point on Alum tower.


  I am open to SWAG's as well as calculated answers. If I missed any 
  critical data, let me know. I know that calculating the sole tower 
  weight beyond the 40' foot attachment is not known, but taking 1/3 of 
  the tower weight as an estimate is close enough. based in the size of 
  the sections below this point, probably conservative.

  any ideas from you geniuses out there?
  _______________________________________________



  _______________________________________________
  TowerTalk mailing list
  TowerTalk at contesting.com<mailto:TowerTalk at contesting.com>
  http://lists.contesting.com/mailman/listinfo/towertalk<http://lists.contesting.com/mailman/listinfo/towertalk>


More information about the TowerTalk mailing list