[TowerTalk] Tower base question
Krishna Kanakasapapathi
kkanakas at cisco.com
Wed Sep 19 11:31:38 EDT 2007
Hello all,
I am in the process of installing an Aluma crankup. I have the permit on hand and am following the specs.
My handi man is helping me with the work.
The tower has a "T" base plate. The Tower hinges to this plate. The "T" plate is expected to be fixed with
5 screws in concrete.
Here are the questions i have.
a) Does the Screws have to be attached to the rebar cage?
b) Is Zinc plated screw good( from home depot). I think not, since it has to be galvanized. The "T" plate is
aluminum.
c) If the screws have to be attached to the rebar cage, i can see that the holes in the "T" plate to receive
the screws do not align well with the rebar cage vertical members. This would mean that i would need
some kind of a plates to hold the screw using bolt/nuts. At least 2 plates per screw to hold it.
d) The handiman is proposing to hold the rebar about 3 inches off the ground ( per spec) using 2x4 and then
as the concrete is poured in, he wants to remove it. I am afraid of this proposal. I have seen other tower
installation pictures where the entire rebar cage is held by 2x4 with nuts holding the screw all the way up
from the "T" plate.
Please let me know.
73's
Krish
w4vku
More information about the TowerTalk
mailing list