[TowerTalk] Guyed tower question
K1TTT
K1TTT at ARRL.NET
Fri Apr 10 07:36:53 PDT 2009
Then you will need 6 good ropes long enough to go from one section below the
top to your anchors. Before you raise each of the unguyed sections tie the
3 ropes on to it, raise it, tie them off, then move the gin pole up. After
the 3rd section with the real guys remove the 6 ropes from below you and
repeat.
David Robbins K1TTT
e-mail: mailto:k1ttt at arrl.net
web: http://www.k1ttt.net
AR-Cluster node: 145.69MHz or telnet://dxc.k1ttt.net
> -----Original Message-----
> From: Brian Machesney [mailto:nekvtster at gmail.com]
> Sent: Friday, April 10, 2009 14:25
> To: towertalk at contesting.com
> Subject: Re: [TowerTalk] Guyed tower question
>
> I am putting up 80 ft of Rohn 25. I am using the steel guys that are part
> of
> the extension to the AB577 system. The benefit is they are one-piece,
> adjustable in length and available to me since I'm taking down my '577 in
> favor of the Rohn 25.
>
> This is also my first tower installation. I am not comfortable climbing
> above a point that is guyed.
>
> Brian K1LI
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
More information about the TowerTalk
mailing list