[TowerTalk] tower installation HG52SS

Michael Goins wmgoins at gmail.com
Sat Feb 13 17:12:19 PST 2010


There is no baseplate. This tower uses a prefab rebar base with mounts
for the tower. No baseplate at all.

Michael Goins
Professor, Writing
University of Texas at San Antonio







On Sat, Feb 13, 2010 at 7:10 PM, chas <chasm at texas.net> wrote:
> Michael Goins wrote:
>> It is not limestone. It is a rock shelf. I have limestone here in
>> places, but there are tremendous boulders and several huge rock
>> shelves. It is in a rock shelf that is absolutely solid, not porous
>> like limestone.
>>
>> Guys, I really appreciate the help.
>>
>> Michael Goins, k5wmg
>> Professor, Writing
>> University of Texas at San Antonio
>>
>
>
> I would still create a base plate with some all thread 1 - 1.5" diam bolts
> and drill the holes thru the base plate and into the basalt or whatever you
> have... about 3' below the base of your factory form.  that would make for
> about 5' to 6' bolts and place those bolts about 3" beyond the three uprights
> of the tower.  if you have the tower base plate, I would have a welder burn
> holes for the bolts and follow my previous suggestions.  I did not get a base
> plate with my HG52 so I bought one and had a sign company do all the metal
> work.  my concrete base is only about 3'x3'x3' and like you, will lower the
> tower to its 20' height in case of hurricane or similar.
>
> 73
>
> chas
> --
> chasm at texas.net   k5dam  Houston, TX
>
> <a href='http://militarysignatures.com'> <img
> src='http://militarysignatures.com/signatures/member14013.png' border='0'
> alt='militarysignatures.com'/></a>
>
> --
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>


More information about the TowerTalk mailing list