[TowerTalk] Plumbing a Tower

Michael Goins wmgoins at gmail.com
Wed Jul 28 07:33:27 PDT 2010


With a crank-up, I always just align the bottom section with a long
(4'-6') level. The upper sections all leans some due to minor binding
when up, cable tension, etc.

With the one going up here (someday!) , as long as the base and lower
section of the tower is as plumb as I can get it, I won't worry about
the rest.

Mike, k5wmg
Pipe Creek, Texas
Fast cars, slow boats, big dogs, old trucks, little radios, and
summers off to write



On Wed, Jul 28, 2010 at 9:27 AM, Kenneth Goodwin <krgoodwin at comcast.net> wrote:
> My self supporting tower may be a little different than a guyed tower but
> when I borrowed a transit to plumb my Rohn SSV tower, I was surprised to see
> that it was a lot like spaghetti.  The sections leaned in all directions. I
> ended up just aligning the very top of the tower.  If one could get rid of
> the wind, a plumb line from the top to the bottom would be my preferred
> method if one didn't have a transit.  Ken K5RG
>
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>


More information about the TowerTalk mailing list