[TowerTalk] "Guying" a 96-foot self-supporting tower <grin>

David J Windisch davidjw at cinci.rr.com
Thu Jun 3 08:36:26 PDT 2010


The idea goes like this:

Couple together, inside the tower, enough lengths of tube-not-pipe to extend 10-15 feet above the tower top-plate. 

Set the tube assembly on a vertical thrust bearing.

Center/restrain the tube in the tower, at several points along its height, with shelves and bearings.

Guy the tube only, through the tower Z-bracing, as if the tube were going to be standing alone, with horizontal thrust bearings at the guy-attachment points, so the tube can rotate.


More information about the TowerTalk mailing list