[TowerTalk] 6000 psi grout

Kurt Cathcart, KR2C Kurt at KuhlRoad.Net
Tue May 24 06:50:27 PDT 2011


I'm installing a US Tower MA40.  The specifications call for filling the 
area between the base of the mast mount and the top of the concrete with 
high strength grout.  What is this stuff and where would I get it?

-Kurt
KR2C



More information about the TowerTalk mailing list