In my case, Rohn 55, the structural engineer started with Rohn data sheet,
applied current wind control calculations for this county, based on the
surveyed anchor and foundation points, to calculate width length and depth
of each foundation/anchor point, such that the tipping moment is not
exceeded in worst case load, per county limits, with the summation of all
wind loads applied as a function of height. Also that foundation can support
the vertical load for the foundation and vertical/horizontal components for
guy anchors, which are soil dependent/ All calculations were required to be
shown on the permit application. Expect to pay around 1K for this. 

Kirby - AF6OP
Message: 9
Date: Thu, 16 Aug 2012 10:41:13 -0700
From: Dave Cole <dave at nk7z.net>
Subject: [TowerTalk] Thinking of putting up an American, or Rohn
	tower...
To: towertalk at contesting.com
Message-ID: <1345138873.9285.49.camel at strangelove>
Content-Type: text/plain; charset="UTF-8"

Hi,
Do any of you know if the engineering data a City would want is
available for either or both of these towers?  I have to have an Oregon
PE review the data for the City here...
-- 
Thanks,
Dave