[TowerTalk] Aligning rotor, mast and thrust bearing

K1TTT K1TTT at ARRL.NET
Fri Oct 5 07:17:18 EDT 2012


Bolt it all roughly into position so it can be lifted.  Then once it is
vertical just loosen the bolts a bit, line it up, and test, then tighten it
all back down.

David Robbins K1TTT
e-mail: mailto:k1ttt at arrl.net
web: http://wiki.k1ttt.net
AR-Cluster node: 145.69MHz or telnet://k1ttt.net

-----Original Message-----
From: Rick Kiessig [mailto:kiessig at gmail.com] 
Sent: Friday, October 05, 2012 10:11
To: towertalk at contesting.com
Subject: [TowerTalk] Aligning rotor, mast and thrust bearing

My new tower project is moving ahead nicely. All major parts have arrived,
including the tower itself (a custom 8.5m x 0.2m diam galvanized pole). Now
it's just a matter of finishing the construction and installation.

 

I've been working on aligning the rotor (PST61), mast and thrust bearing
(TB3). I was thinking about bolting everything to the tower before they
crane it into place (suggested by the installer). However, I'm finding it to
be a challenge to align things correctly, particularly with the tower laying
down at an angle - too many degrees of freedom.

 

I suppose I could just wait until the tower is vertical, but even then it
seems like it won't be easy (since it was a custom build, I would also like
to confirm that the bolt holes for the rotor plate and the thrust bearing
line up correctly). If anyone has any suggestions / tips along these lines,
I would love to hear them.

 

73, Rick ZL2HAM (ZL1G/ZM1G)

 

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk at contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk



More information about the TowerTalk mailing list