[TowerTalk] Top Level Guy Wires on 70 ft Tower - K3SEW

DigitalJukeBox DigitalJukeBoxDJ at comcast.net
Tue Sep 11 17:47:17 EDT 2012


Can anyone suggest the lengths of insulated sections to use for 3/16 EHS guy
wire for the top level guy wires on a 70 ft tower with a TH7DX Tribander for
20-15-10 meters? The top guys are at the very top of the tower, 3 ft under
the beam. Don't want to upset the SWR of the beam.

Lowest level of guys are at 35 ft and have no strain insulators. But want to
insulate the top level at 70 ft to protect the beam.

73,

Ron
K3SEW
Howard, PA


More information about the TowerTalk mailing list