[TowerTalk] Conrete Costs

Edward Sawyer SawyerEd at Earthlink.net
Tue Dec 24 20:10:15 EST 2013


Definitely too much compare to what I did here.  Concrete locally today is
about $150 a yard.  A truck holds 7 - 10 yards.  If you are using half a
truck or more, they will wait for you to haul.  I had a full truckload and
the truck was there for 2 1/2 hours total and charged me an extra $150 in
wait time.  We hauled the concrete up with a bobcat with a good sized
bucket, it seemed to be about 1/3 yard of concrete per bucket.  The run was
about 175ft up a 40 deg incline to a ridgetop.  Then there was from 30 to
150 ft to the holes.

 

Bobcats and small backhoes are about $80 - $90 an hour.  $300 in Bobcat and
$150 in wait time got 10 yards poured in about 2.5 hours.  There was a
second run of about 5 yards the next day to finish it off.

 

The holes took one day for 8 holes for 2 guyed towers of a smaller tracked
backhoe.  That was $1000.

 

Ed  N1UR