I am going to use a crane to lift a 60' Rohn 25 tower. I am using 2 sets of guy wires. 1 set at 28' and the other at 55' per Rohn. The guy wires will be attached to the tower when lifted. My question is this: which set should be tightened 1st? Top set or bottom set? Or does it matter? 73 NR6M ex: KF7NMD Sincerely, Rex Turvin www.nr6m.com