[TowerTalk] Base equivalent
Mike Reublin NF4L
nf4l at comcast.net
Sun Jan 12 06:01:40 EST 2014
Thanks all for your comments and suggestions. I'm going to contact an engineer Monday. The fee will be a bargain for peace of mind.
73, Mike NF4L
On Jan 10, 2014, at 4:28 PM, Mike Reublin NF4L <nf4l at comcast.net> wrote:
> The specs for my crank up call for a hole 4x4x7.5 feet. That works out to 4.4 yds of concrete. The smaller backhoes that I can get to the site can go to a depth of 6 feet. Because of the water table, I consider it an unacceptable risk to put a man in the hole to dig out to 7.5 feet deep.
>
> A hole 5x5x6 is 5.5 yds.
>
> Would that be a safe equivalent to hold the tower up with the same wind load?
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
More information about the TowerTalk
mailing list