[TowerTalk] New Tower Contemplated
Jim Weslager
weslager at gmail.com
Fri Jan 2 15:45:42 EST 2015
I am planning to erect a Universal Towers 50 foot, 123 lb. (model 9-50) aluminum tower in April when the ground thaws. My plan is to install the 50 footer on a hinged base to crank it over for servicing.
I am thinking a 12 foot pole installed 4 feet into a concrete base would allow me to raise / lower the tower using a hand winch and pulley. The pulley mounted near the top of the 8 ft. above ground pole should give me the purchase point height needed to hoist the tower from the horizontal position.
Before I get too far ahead of myself, does anyone with any actual experience have recommendations for installing an adjacent pole with a winch and pulley to hoist and lower the tower?
How close to the tower can I install the hoisting pole?
Is a pulley mounted near the top of an 8 ft. above ground pole sufficient to do the job?
Anything I am missing here?
I'm sure this has been done or tried before and would be most gracious to learn of your experience and recommendations.
Thanks and 73,
Jim - K3WR
More information about the TowerTalk
mailing list