[TowerTalk] New Tower Contemplated
Gedas
w8bya at mchsi.com
Fri Jan 2 22:09:00 EST 2015
I have 3 towers I raise and lower the way you describe. I keep several
dozen images of these towers at the URL below. The last dozen or so
images at the bottom represent a tower I installed this summer.
http://w8bya.com/index.php/Misc/HAM-1
Gedas, W8BYA
Gallery at http://w8bya.com
Light travels faster than sound....
This is why some people appear bright until you hear them speak.
On 1/2/2015 3:45 PM, Jim Weslager wrote:
> I am planning to erect a Universal Towers 50 foot, 123 lb. (model 9-50) aluminum tower in April when the ground thaws. My plan is to install the 50 footer on a hinged base to crank it over for servicing.
>
> I am thinking a 12 foot pole installed 4 feet into a concrete base would allow me to raise / lower the tower using a hand winch and pulley. The pulley mounted near the top of the 8 ft. above ground pole should give me the purchase point height needed to hoist the tower from the horizontal position.
>
> Before I get too far ahead of myself, does anyone with any actual experience have recommendations for installing an adjacent pole with a winch and pulley to hoist and lower the tower?
>
> How close to the tower can I install the hoisting pole?
> Is a pulley mounted near the top of an 8 ft. above ground pole sufficient to do the job?
> Anything I am missing here?
>
> I'm sure this has been done or tried before and would be most gracious to learn of your experience and recommendations.
>
> Thanks and 73,
>
> Jim - K3WR
>
>
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>
More information about the TowerTalk
mailing list