I installed my new 72' US Tower last year and did the work myself including picking it up in Kansas. The 5'x5'x8' hole was dug for $450 which included spreading the dirt at various places on my 5 acres. I was surprised at how accurate it was also, those guys are good. The rebar I would guess was about $150 . The cement cost about $750 so the total must have been near $1,200. No other cost were incurred because I was not in a city. I finished the cement myself with the help of the cement truck driver.
If I had been in a major city I know it would have been much higher but having been in construction most of my life as an electrician, I knew it was very doable and being retired time was not a factor. Sounds like there may be some collusion among the contractors and inspectors if they had the guts to charge $7,000. As they say, Location, Location, Location...... Russ K5ZZR My Heroes Wear Combat Boots!