[TowerTalk] excel spreadsheet for calculating moment of inertia
    jimlux 
    jimlux at earthlink.net
       
    Wed May  4 11:17:22 EDT 2016
    
    
  
I'm doing a generalized excel spreadsheet for calculating moment of 
inertia for a Yagi..
Is there a quasi standard format for specifying the lengths and 
diameters of elements and boom position (e.g. what you'd put into EZNEC 
or similar).
If someone could send me an example text file (off list, please) I can 
make it easy to cut and paste the tedious part into the spread sheet.
For modeling, you typically have a schedule of tapers: the sequence of 
diameters are the same for all elements, but the length of each diameter 
is different for each element.
What's not in a NEC model (and would have to be entered separately) is 
things like:
- fastener mass (rivets, bolts, worm gear clamps)
- overlap of tubing
- boom attachment mass
- matching network
Otherwise, I'll just pick something that seems easy (for me, which might 
not be easy for you)
73
W6RMK
    
    
More information about the TowerTalk
mailing list