I would suggest you put wire mesh centered in the two inch thick pour which
may help to keep the concrete from cracking.
Howard WA9YBW
The new concrete won't adhere very well to the old
and will probably crack.
(Here in AZ almost all houses are slab-on-grade. There is a saying, "There
are
two types of concrete slabs, those that are cracked and those that are going
to
crack.")
On 2/4/2017 8:26 AM, Paul Christensen wrote:
> Thanks to all who replied by private e-mail. Many folks suggested using a
> concrete cutter to trim the base edges square. Yesterday, I went back out
> to the site and took some measurements of the leg bolts. There's ample
> distance to overlay about 2 inches of concrete to the top surface and
> extend
> the base square from 10 ft. to 11 ft. with a new outer frame. I come up
> with about 1 cu. yd of concrete. Four pieces of 2"x6"x12 ft. boards
> should
> do the trick. This is the concrete equivalent of capping a tooth. The
> overlay is purely cosmetic and doesn't need to be part of the original
> pour
> which meets spec. Anyone see any issues with this?
>
> Paul, W9AC
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk at contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
More information about the TowerTalk
mailing list