[TowerTalk] best way to seal concrete with cut off tower section

Matt Lovewell lovewell at gmail.com
Tue Jul 11 19:29:31 EDT 2017


Non-shrink grout

> On Jul 11, 2017, at 1:41 PM, mike stokes <mike9v at gmail.com> wrote:
> 
> I am in the planning stages of replacing 95' of Rohn 25 with 100' of Rohn
> 45.  The 25 has the bottom section concreted in.  I plan on drilling and
> epoxying a pier pin for the Rohn 45.  When I cut it off the 25, the holes
> in the legs will be exposed.  What is the best method to seal the leg holes
> to ensure they don't get water in them and freeze ?
> 
> Thanks in advance.
> 
> -- 
> Mike Stokes
> KK9V
> _______________________________________________
> 
> 
> 
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk


More information about the TowerTalk mailing list