[TowerTalk] How to drill foundation?
Robert Gerace
robert.gerace at gmail.com
Thu Aug 6 12:39:24 EDT 2020
I just received my engineered plans and learned of the foundation requirements.
The plans state:
“48” x 12’4” (If circular) below grade and 4” to 6” above grade. Order a complete truck to avoid shortage”
I’m thinking my idea to rent a mini-ex and dig my own hole just went out the window.
To avoid using two trucks I’m thinking I want to use a 4 foot wide auger that can go down 12’4”. I’m also thinking I want to hire someone to get it perpendicular.
My question is: how do I find / hire the cell tower footing guys? Or does the group have any better ideas?
Also, I’m in FL near the coast. I’m pretty sure I’m going to have a lot of water in the pit.
Thanks
Bob
KD4Q
Sent from my iPhone
More information about the TowerTalk
mailing list